Our projects across aviation, healthcare, retail, security, and public infrastructure nationwide.
Featured Projects
Three of our featured engineering projects.

Penjara Seberang Perai / Penjara Jawi
High security integration suite combining alarm handling, anti-climb fencing, guard tour, CCTV, electronic cell locks, VMD, card access, PIR, and lighting systems; awarded the JKR Excellence Award – Best Building Project (Category A: Building Project over RM100 Million).

KLIA 2 Terminal
Fast-track native BACnet BAS project managing 20,000 I/O points and 25,000 high-level interfacing points, achieving GBI Platinum certification.

KL Pavilion
Major BAS migration with 15,000 I/O points replacing a legacy third-party system with Delta entelliWEB software; retained existing DDCs and sensors to optimise client ROI, replacing hardware only as required.
Project Portfolio
Our systems and integrations deployed across Malaysia.
Security & ELV Integration

Airport Infrastructure
KLIA International Airport Car Park
Fully integrated LPR CCTV, emergency panic buttons, card access control and centralised parking management system.

Prison Infrastructure
Penjara Seberang Perai / Penjara Jawi
High-security ELV suite featuring alarm handling, anti-climb fencing, guard tour, CCTV, electronic cell locks, Video Motion Detection (VMD), card access, PIR sensors, and integrated lighting controls.
Building Automation (BAS)

Green Automation
Suruhanjaya Tenaga HQ
Green automation features environmental control, digital power meter monitoring, water leak detection, and automated irrigation system control.

Airport Infrastructure
KLIA 2 Terminal Building
Fast-track native BACnet project managing 20,000 I/O points and 25,000 high-level interfacing points; integrated with VSD, VAV, CEMS, lifts, fire alarms, AFMS, DPM/DWM district cooling, leak detection, and maximum demand systems to achieve GBI Platinum status.

Healthcare BAS Systems
Queen Elizabeth Hospital
Native BACnet medical BAS (Phase 1: 1,750 points; Phase 2: 1,338 points) interfacing with chillers, AHUs, FCUs, fire alarms, electrical monitoring, water systems, and medical gas distribution

Healthcare BAS Systems
Pantai Hospital Ampang
1,530 I/O points native BACnet system; seamlessly integrates chillers, AHU, FCU, fire alarms, electrical monitoring, water management, and medical gas systems.

Healthcare BAS Systems
Gleneagles Hospital KL
2,350 I/O points on a native BACnet system; features 25 VSD pump units replacing AHU actuators, interfacing with chillers, AHU, FCU, fire alarm, electrical, water, and medical gas systems.

Airport Infrastructure
Sultan Ismail Petra Airport
Native BACnet deployment across Phase 1 & 2 totaling 6,000 I/O points and 1,300 high-level interfacing points; integrated with VSD, lifts, fire alarms, DPM, and BTU meters.
Commercial & Retail Solutions

Commercial Control
KL EAST Mall
Engineered and commissioned a high-density, 7,500-point BAS, utilising BACnet and Modbus protocols to deliver centralised DDC control, real-time telemetry, and optimised ACMV/HVAC plant automation across the complex.

Commercial Automation
UMW Toyota Headquarters
1,600 I/O point BAS integrated with Delta Card Access Control for centralized HVAC management and corporate security.

Commercial Control
Hap Seng Kinrara
1,600 I/O point BAS integrated with Delta Card Access Control for centralized HVAC management and corporate security.

Commercial Automation
Kenanga Wholesale City Mall
1,980 I/O point retail automation framework optimizing central cooling plant operations and air distribution for high-traffic environments.

Commercial Automation
Elite Pavilion Kuala Lumpur
5,800 I/O point enterprise system engineered for a complex steel structure to provide real-time control over high-capacity ventilation and critical building services.
System Retrofit & Upgrades

System Replacements
KL Pavilion Mall
15,000 BAS I/O points; migrated legacy third-party system to Delta entelliWEB while preserving existing DDCs and sensors, replacing hardware only as needed.

System Replacements
Intermark Mall
3,200 BAS I/O points; complete third-party BAS replacement and full software migration to Delta entelliWEB.

Campus Systems
Kolej MDIS
3,000 BAS I/O points; campus-wide legacy system upgrade and integration onto the Delta entelliWEB platform
Large-Scale Parking Deployments
Parking systems typically include LPR systems, “find your bay” car locators etc. Features can be included or excluded based on client needs, please contact us for a comprehensive list of features and we can tailor to suit your needs.
Our more famous projects

Pavilion KL

TRX Exchange 106
The two projects below has a parking system integrated with an existing IT server, with specially requested features such as preferred parking charges and a pre-booking system for specific individual bays.

KLCC Group
- Kompleks Dayabumi
- Mandarin Oriental
- Menara 3 PETRONAS
- Suria KLCC
- PETRONAS Twin Towers
- Menara Maxis
- Menara ExxonMobil

KLIA
Cashless & LPR Systems
- KLCC Group Parking12,500Bays
- KLIA7,500Bays
- IOI Mall Damansara3,500Bays
- TRX Exchange 1062,200Bays
LPR-based Guidance
- TRX Exchange 1062,250Bays
- KLCC Convention Centre780Bays
- Menara Sapura@KLCC495Bays
- Subang Jaya Medical Centre850Bays
Ultrasonic Guidance
- Damansara Uptown / Starling Mall3,450Bays
- KL Pavilion2,800Bays
- Arcadia Plaza1,900Bays
- Gurney Paragon1,800Bays
- Quill City1,300Bays
- Sunway Nexis1,200Bays
- Equatorial Plaza1,000Bays
- Sogo Complex900Bays
- Public Mutual Tower850Bays
- Berjaya Central Park / The Ritz-Carlton Residences800Bays
- KLCC–Impiana Hotel150Bays